Progress--ShenZhen Liush Machinery Equipment Co.,LTD.
Progress
  • 1995

    1995 Willow Creek company planning to set up in Shenzhen Bao Anxi township, beginning in painting, assembly, logistics and electronic equipment planning, design, fabrication, and construction services.

  • 1998

    In 1998 the company expanded scale relocation to Xixiang treasure state industrial area, and undertake Bright lighting coating line, the new coating line Kam big bike design, production and construction services.

  • 2000

    2000 Willow Creek has pioneered in the surface treatment equipment industry through the ISO9001: 2000 quality system certification, and for the first time to participate in an international exhibition surface treatment.

  • 2001

    2001 Willow Creek company joined Chinese painting Branch Surface Engineering Association Member and machinery industry association, and served as its executive director of the enterprise。 Willow Creek opened the mechanical set up Shanghai branch, to undertake the painting project is far lighter in Kunshan, Shanghai Jing Yuan, Baoding Lizhong, Wuxi Dicastal other automotive wheel line, successfully entered the automotive parts industry coating production。


    2002 to undertake the Shanghai Nisshin, Zhangjiagang Rui Jin and other auto parts electrophoresis line, to further consolidate the status of the auto parts industry, paint industry, engineering planning, design, manufacturing, construction and services.


  • 2003

    2003 an area of 25,000 square meters of Willow Creek Industrial Park officially opened, the company headquarters relocated Baoan Utopia innovation and technology park, and the construction of the entire plant in Jiangmen Daye (13) motorcycle painting production line project.

  • 2004

    In 2004 and set up a production base in Suzhou, Suzhou Branch, Guangdong Meizhi construction of air-conditioning compressor, etc。 Jiangmen Hyundai wiper cathodic electrodeposition coating line。

  • 2005

    2005 establishment of the Chongqing branch, the construction of Zhuhai Gree, Jiangmen the Yangtze River, Chongqing Cafu, wuhanzhaohe Chongqing Loncin, Jinfei Zhejiang, Sichuan Changhong, Hisense and other well-known enterprises in Xiamen coating production lines.

  • 2006

    2006 to set up branch offices in Beijing and Hong Kong, the construction of Panasonic, Konka, Foxconn, Vantage, Nypro, Pao Xiang other enterprises appliances, mobile phones, laptops shell coating and Feng Yu Guangzhou, Jiangmen Emori, Changchun Fawer, etc. Auto production line.

  • 2007

    In 2007, the company successfully undertake the BYD phone lines and coloring electrophoresis production line, and to undertake a Matthey, Chi-ping letter car wheels coating line. Willow Creek Suzhou undertake a GM car kit electrophoresis line and powder coating line. Anhui purchase 100 acres and began planning the manufacturing and processing base in Anhui.

  • 2008

    2008, Suzhou Willow Creek successfully undertake Minth electrophoretic coating line auto parts, precision electromechanical Spectrometry swimming lanes, Shenzhen Willow Creek successfully undertake the Posco Ostrom electrophoresis line, and to undertake a Meizhi, Changhong Haier washing line and compressor electrophoresis electrophoresis line. Suzhou Willow Creek since the purchase of office space and moved to a new plant in Suzhou Industrial Park.

  • 2009

    In 2009, an area of 100 acres of Anqing Willow Creek Industrial Park, a project put into use, Shenzhen Bao'an District Willow Creek was rated top 100 private enterprises.

  • 2010

    2010 Willow Creek eligible for high-tech enterprises in Suzhou, Jiangsu Province, Jiangsu Province, engineering and technology center passenger powder coating title。

  • 2011

  • 2012

    2012, Anqing Willow Creek office relocation company in Hefei, Anqing Willow Creek Industrial Park, the second phase of the project completed, Willow Creek Group already has one billion yuan of engineering design, processing capacity in Shenzhen, Suzhou, Anqing three。

  • 2013

    2013, Electrical and Mechanical Engineering Co., Ltd. Suzhou Willow Creek office relocation Super Constellation Class 5A Business Plaza.


江苏福彩 甘肃快三 江苏福彩 新浪彩票 江苏福彩 甘肃快三 江苏福彩 江苏福彩 江苏福彩 甘肃快3